Laserfiche WebLink
Inspection Topic Summary <br />NOTE Y= Inspected N =Not Inspected R= Continents Noted V= Violation Issued NA =Not Applicable <br />R - Air Resource Protection <br />R - Roads <br />R - Availability of Records <br />R - Reclamation Success <br />NA - Backfill & Grading <br />Y - Revegetation <br />NA - Excess Spoil and Dev. Waste <br />Y - Subsidence <br />N - Explosives <br />N - Slides and Other Damage <br />Y - Fish & Wildlife <br />R - Support Facilities On -site <br />R - Hydrologic Balance <br />R - Signs and Markers <br />R - Gen. Compliance With Mine Plan <br />Y - Support Facilities Not On -site <br />R - Other <br />NA - Special Categories Of Mining <br />R - Processing Waste <br />Y - Topsoil <br />September 12, 2011 <br />C -1982- 056 /Foidel Creek Mine <br />JDM <br />AIR RESOURCE PROTECTION — Rule 4.17: <br />Water truck utilization for dust suppression was active during the inspection of the site. No problems were noted <br />in terns of fugitive dust or coal test from the RDA. <br />AVAILABILITY OF RECORDS — Rule 5.02.4(1): <br />All records were located at the TCC office. See attached DRMS Availability of Records. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3: Siltation Structures 4.05.5, 4.05.6: Discharge Structures 4.05.7, <br />4.05.10: Diversions 4.05.4: Effluent Limits 4.052; Ground Water Monitoring 4.05.13: Surface Water Monitoring <br />4.05.13: Drainage — Acid and Toxic Materials 4.05.8: Impoundments 4.05.6, 4.05.9: Stream Buffer Zones 4.05.18: <br />Ponds B. C, D. E, F, G, 6NM, 18LT, 6NM sediment pond, the Fish Creek borehole pond, the Fish Creek tipple <br />pond, and the Pit Pond were observed during the inspection. Discharge was noted at Ponds d and the Fish Creek <br />Tipple Pond. All other ponds were not discharging. All pond embankments were stable with no problems noted <br />with the exception of the following: <br />- The Fish Creek Tipple pond embankment may need to be reseeded in the area of the repair work to the primary <br />spillway. <br />- The 18LT upper pond embankment erosion has not been addressed as of the date of this inspection. <br />- The embankments of the 6MN holding pond will need to be reseeded in order to establish adequate vegetated <br />cover for stability. <br />- The 6MN Sediment pond embankment erosion has been addressed. However, further erosional gullies were <br />observed to the west of the repair work. <br />Number of Partial Inspection this Fiscal Year: 3 <br />Number of Complete Inspections this Fiscal Year: 1 <br />COMMENTS <br />Page 2 of 8 <br />