Laserfiche WebLink
f <br /> RECLAMATION COSTS <br /> Climax Mine <br /> ( February, 1985 ) _.�------ <br /> Many affected areas have been revegetated, but are not con- <br /> sidered totally reclaimed. Estimated costs and surety bond amounts <br /> for such areas are adjusted downward as reclamation occurs and <br /> upward to cover additional disturbed areas . Because of the <br /> continuously changing acreage and status of affected land, the Board <br /> stipulated that reclamation costs be updated every two years in <br /> conjunction with submittal of the annual report and map . The <br /> existing bond , covering reclamation cost estimates for the 1983-1984 <br /> period , is for $22 million (per 1982 Annual . Report submitted in <br /> February, 1983 ) . We have refined our acreage estimates, our methods <br /> and our costs. The estimated costs of reclaiming all anticipated <br /> disturbances through 1986 is $25 . 281 million. <br /> A. Site Type Revegetation Costs (per acre) <br /> 1 . Basic Revegetation Cost <br /> Man-Days Labor Equipment Material Total <br /> Inorganic Fertilizer 1 .2 $156 $120 $ 86 $362 <br /> Straw <br /> (purchase & spread) 1. 0 130 100 280 510 <br /> Mixing into Surface 1. 2 156 240 -- 396 <br /> Seeding . 2 26 20 125 171 <br /> Trees (225) 3 .0 390 -- 135 528 <br /> Shrubs ( 75) 1. 0 130 -- 45 175 <br /> Maint . fer. <br /> ( 3 applications) .6 78 -- 36 114 <br /> TOTAL $2 ,256 <br /> This is our average revegetation cost . The costs would be <br /> slightly less using sewage and wood chips . Some areas have <br /> subsoil and may not require straw, costing still less . Other <br /> areas such as very steep slopes , may require more effort and <br /> materials , thereby costing more. We have used an average of <br /> $2, 250 in the following calculations . <br /> -1- <br />