Laserfiche WebLink
C) Other backfilling on site of process ponds and general grading is limited to 16,000 cy. <br />The total backfilling and grading quantity is therefore 48,000 cy. <br />3. Spread Topsoil <br />The two topsoil piles created when the initial mine was disturbed will be used in the reclamation <br />of the site. Since 21.13 acres will need to be covered with 6 inches, this is a quantity of 17,044 cy. <br />The topsoil piles are conveniently located on the site, allowing a short distance for the haul and <br />spreading. For this reason, the cost of this task is $1.00 per cy. Mulching will occur from the dead <br />tree mulching activity off the permit area, but this is an additional step that is not necessary, <br />therefore, it is not bonded for. <br />4. Revegetation <br />The 21.13 acres will be scarified after topsoil placement and weed spraying will also occur. The <br />seed mix shown in Exhibit E will be broadcast over the acreage and the mulch will be applied. A <br />cost of $811.35 per acre is used for this work, which is identical to that calculated by the Division <br />for the Alma Placer site a few miles to the north. <br />