Laserfiche WebLink
Status - Terminated and Replaced <br /> The Division initiated a reevaluation of the bond in February 1994, <br /> and identified additional concerns . These concerns have been <br /> identified in a new stipulation, Stipulation No . 24 (see below) . <br /> The bond is being reviewed pursuant to the procedures of <br /> 3 . 02 . 2 (4) . The bond estimate by the Division was completed on June <br /> 17 , 1994 and hand delivered to the operator on June 22 , 1994 . <br /> Stipulation No . 24 <br /> AS A COMPONENT OF THE 1994 PERMIT RENEWAL AND BOND ESTIMATE REVIEW, <br /> THE DIVISION HAS DETERMINED THAT THE CURRENT EFCI RECLAMATION PLAN <br /> IS DEFICIENT IN THE FOLLOWING AREAS : <br /> 1 . THE MASS BALANCE FOR THE OVERBURDEN AND TOPSOIL FOR THE FINAL <br /> REFUSE PILE CONFIGURATION NEEDS TO BE CALCULATED AND IF ANY <br /> DEFICIT IS FOUND, EFCI NEEDS TO SUBMIT A PLAN TO MAKE UP THE <br /> DIFFERENCE IN OVERBURDEN AND TOPSOIL. <br /> 2 . FINAL DEPOSITION OF THE ON-SITE CONCRETE NEEDS TO BE CLARIFIED <br /> IN THE PERMIT. <br /> 3 . SHOULD EFCI WISH TO PURSUE AN ALTERATION FROM THE PRESENTLY <br /> APPROVED POST-MINING CONTOURS AND CONFIGURATION AT THE <br /> LOADOUT, THIS ISSUE NEEDS TO BE ADDRESSED IN A TECHNICAL <br /> REVISION TO BE REVIEWED AND APPROVED BY THE DIVISION. <br /> 4 . IN ORDER TO VERIFY FACILITY BACKFILL VOLUMES, THE OPERATOR <br /> WILL PROVIDE AN ACCURATE CURRENT TOPOGRAPHIC/CONTOUR MAP WITH <br /> APPLICABLE CROSS-SECTIONS TO REVISE MAPS 6 AND 7 . <br /> THE ABOVE ISSUES ARE TO BE RESOLVED IN A REVISION(S) TO BE <br /> SUBMITTED WITHIN 60 DAYS OF PERMIT RENEWAL. <br /> Status-Terminated <br /> This stipulation was resolved with Technical Revision 20, which was <br /> approved on 22 September 1995 . <br /> Southfield Mine Permit Renewal 03 <br /> 13 <br />