Laserfiche WebLink
Stipulation No. 25 <br /> The Operator will submit a revised Map 1, which depicts the loadout <br /> permit boundary. This map will be submitted as part of the ongoing <br /> Technical Revision 20 . <br /> Status-Complied With, Terminated <br /> This stipulation was complied with on 26 September 1995 with the <br /> approval of Technical Revision 20 . <br /> Stipulation No. 26 <br /> The permit boundary shall be revised in accordance with Technical <br /> Revision 23 , on Maps 6, 17 , 19, 20 and 28 . Three copies of the <br /> maps shall be submitted via the minor revision process no later <br /> than 10 July 1996 . <br /> Status - Complied With, Terminated <br /> This stipulation was complied with on 19 August 1996 with the <br /> submission of updated maps 6, 17 , 19 , 20 and 28 . They were not <br /> submitted as a separate revision, rather, they were submitted in <br /> conjunction with Technical Revision 23 . <br /> Stipulation No. 27 <br /> EFCI must submit a plan that addresses the requirements of section <br /> 4 . 06 . 2 (4) for the loadout area ponds, or submit a plan that <br /> includes provisions for imported topsoil material for the loadout <br /> area ponds . EFCI ' s proposal, in the form of a revision to the <br /> permit, must be received by DMG no later than 10 July 1998 . <br /> Status - Complied With, Terminated <br /> The required submittal date for this stipulation was extended with <br /> the approval of Minor Revision 35 on 12 May 1998 . The stipulation <br /> was complied with on 17 July 1998 with the approval of Minor <br /> Revision 38 . <br /> Southfield Mine Permit Renewal 03 <br /> 14 <br />