Laserfiche WebLink
Stipulation No . 21 <br /> THE OPERATOR WILL PROVIDE BY DECEMBER 31, 1993 AN EXPLANATION FOR <br /> THE DATA INDICATING 27-29 DEGREES FOR AN ANGLE OF DRAW FOUND IN THE <br /> 1991 MAY-OCTOBER SUBSIDENCE REPORT, AND AS PART OF THE EXPLANATION, <br /> PROVIDE TO THE DIVISION BY DECEMBER 31, 1993 , APPROPRIATE <br /> DOCUMENTATION ACCOMPANIED WITH AN EXPLANATION OF THE ERROR BY THE <br /> SURVEYOR THAT THE DATA IS THE RESULT OF SURVEY ERROR AND NOT <br /> MEASURED SUBSIDENCE. <br /> Status - Terminated <br /> The Division received a request for an extension to respond to this <br /> stipulation in a letter dated December 29, 1993 . The Division <br /> granted the request, extending the date to January 21, 1994 . A <br /> faxed response from TerraMatrix was received on January 17 , 1994 <br /> which agreed with the Division' s more conservative angle of draw of <br /> 27 to 29 degrees . Technical Revision No. 19 was received on June <br /> 16, 1994 to address the boundary changes that the extended angle of <br /> draw would incur. TR19 is currently under review for adequacy. <br /> Stipulation No . 22 <br /> THE OPERATOR WILL SUBMIT TO THE DIVISION BY JANUARY 31, 1994 , <br /> UPDATES TO ALL POND AS-BUILTS THAT INCLUDE ALL RECENT IMPROVEMENTS <br /> ON PONDS 1, 2 , 3 , 4, 5 AND LOADOUT PONDS L-1 AND L-2 . <br /> Status - Terminated <br /> The updated pond as-builts were received and approved on January <br /> 31, 1994 via a fax copy. The certified maps were received by the <br /> Division on February 2 , 1994 . <br /> Stipulation No . 23 <br /> THE OPERATOR AND THE DIVISION WILL RESOLVE OUTSTANDING BOND ISSUES <br /> FROM THE MIDTERM REVIEW DURING THE PERMIT RENEWAL PERIOD, JANUARY <br /> THROUGH MAY 1994 . THE ISSUES THAT WILL BE RESOLVED ARE THE <br /> FOLLOWING: REEVALUATION OF THE BOND ESTIMATE SUBMITTED BY THE <br /> OPERATOR AND UNTIL RESOLUTION, THAT THE CURRENT BOND AMOUNT OF <br /> $849 , 410 . 00 WILL REMAIN IN PLACE, AND, SECONDLY, THAT THE FINAL <br /> RECLAMATION CONTOURS AT THE LOADOUT WILL BE DETERMINED AFTER REVIEW <br /> AND FINAL APPROVAL BY THE DIVISION. <br /> Southfield Mine Permit Renewal 03 <br /> 12 <br />