Laserfiche WebLink
Explosives Bunkers <br /> Two explosives bunkers located about one (1) mile from this area will be demolished and <br /> removed to this location for disposal. In addition, building foundations located about 0.2 miles <br /> toward the main gate from this area will also be demolished and removed to this location for <br /> disposal. <br /> Measurement and Payment <br /> There will be no measurement for payment. Payment for this task will be reflected in a lump <br /> sum bid under Item 2 on the Bid Schedule. This lump sum bid will cover all costs for <br /> structural demolition and removal of rubble and debris from each work area, described above, <br /> to the disposal areas (base of highwalls or other designated cut slopes). Payment shall be as <br /> this task is completed and approved by the PROJECT MANAGER. <br /> TASK 3 SILT FENCE <br /> Silt fences(sediment containment fences) will be installed as per manufacturers specifications <br /> at various locations to minimize the transportation of sediment from each construction area. <br /> Placement of silt fencing will occur at locations specified by the PROJECT MANAGER, <br /> generally immediately following excavation operations. The CONTRACTOR will supply the <br /> prefabricated silt fence with posts (Mirafi Prefabricated Silt Fence with Posts having a 3 foot <br /> width and 8.2 feet between posts, or equivalent). It is estimated that the following lengths <br /> of silt fence will be installed at each of the respective areas: <br /> Mine 1 Fan 100 feet <br /> Mine 1 Yard 300 feet <br /> Mine 1 200 feet <br /> Mine 2 100 feet <br /> Mine 2 Conveyor 200 feet <br /> Mine 2 Bathhouse Area 150 feet <br /> Mine 2 Fan 100 feet <br /> Coal Silo Area 200 feet <br /> Lower Bench Area 150 feet <br /> Measurement and Payment <br /> Silt fences erected will be measured to the nearest linear foot. Payment for this task will at <br /> the prices established in Item 3 of the Bid Schedule per lineal foot installed. Such payment <br /> shall be considered full compensation for all labor, materials, equipment and all other items <br /> 10 <br />