necessary and incidental to the furnishing and placement of the sediment containment fences <br /> as directed and described in the specifications. Payment will be as this task is completed and <br /> approved by the PROJECT MANAGER. Payment for this task will be made only for the unit <br /> price shown under Item 3 of the Bid Schedule. <br /> Task 4 EARTH WORK <br /> The earth work portion of this bid involves reclamation of Mines 1 and 2 and associated <br /> disturbances, including both Fan areas(benches and access roads), Mine 1 Storage Yard, Coal <br /> Silo Area, Mine 2 Bathhouse, the Lower Bench Area, and the bench outslopes. Generally, <br /> material will be excavated from the bench outslopes and transported to the base of existing <br /> highwalls, cuts and mine entries for backfilling against the highwall or cut. Coal fines and <br /> similar materials spread on the ground at the Coal Silo and Lower Bench Areas will be <br /> disposed of against the cut slopes at these areas prior to backfilling with material from the <br /> outslopes. Earth work shall progress so that reclamation activities at the fan entries and fan <br /> roads are completed prior to access becoming restricted due to construction at the Mine <br /> entries. <br /> The PROJECT MANAGER shall mark the targeted backfill height and length at each backfill <br /> area by spray paint or other suitable means. All backfilled and excavated (cut) slopes shall <br /> not exceed 2H:1 V upon completion of operations, unless otherwise noted. All backfilled <br /> slopes shall be compacted every four (4) feet by sheep's foot roller, unless otherwise noted. <br /> All bench remnants and the adjacent roadways shall be ripped to a depth of eighteen (18) <br /> inches upon completion of backfilling and grading operations, unless otherwise noted. <br /> Task 4a - Mine 1 Fan <br /> At the Mine 1 Fan, the upper portion of the fan bench outslopes will be uniformly excavated <br /> such that no excavated slope exceeds 2H:1 V upon completion of the excavation. The <br /> excavated material shall be transported to the base of the highwall and placed over the rubble <br /> fill, if any. The debris and rubble fill shall be covered by a minimum of four (4) feet of backfill <br /> material during this portion of the project. If the entries have not been completely filled with <br /> rubble and debris, they shall be filled with earthen materials from the block wall to the <br /> entrance, and from floor to roof. Care shall be exercised in order that the block wall within <br /> the entry not be damaged. <br /> A portion of the highwall shall be backfilled by placing material excavated from the outslope <br /> of the bench against the now filled entries. The backfill shall extend ten (10) feet above the <br /> highwall bench remnant at each entry. The length of highwall to be backfilled is estimated <br /> at fifteen (15) feet at each entry. Upon completion, the outslope of the fill shall not exceed <br /> 2H:1 V, and shall be graded to blend with the adjacent hill slopes. <br /> Task 4b - Mine 1 Fan Access Road <br /> The purpose of reclamation work at the fan access roads is to promote surface drainage from <br /> the road surfaces as sheet flow whenever possible, thus minimizing the channelization of <br /> water. This will be accomplished by employing one of three techniques as specified by the <br /> PROJECT MANAGER. Some portions of the roads have a relatively flat gradient. At these <br /> 11 <br />