locations, the road will be ripped, and graded as needed, so that water flows across the road <br /> surface as sheet flow. In those sections of the roads where the gradient is steeper, some <br /> excavation of material from the outside edge of the road and filling on the inside edge of the <br /> road will be accomplished to encourage sheet-flow drainage. In steeper areas, rolling dips will <br /> be constructed in order to channel water off of the roadway. Rolling dips will be constructed <br /> and paid for under Task 6, Drainage Construction: Rolling Dips. <br /> Road drainage culverts shall be decommissioned when located. The culverts will be excavated <br /> and removed if shallow (three feet or less from ground surface to culvert), or pinched closed <br /> if deeply buried. Both ends of the culverts left in place will be pinched closed. <br /> Road Techniques <br /> Grading and Ripping. Existing berms on the outside of the roads shall be eliminated. The <br /> bermed material shall be removed to the inside edge of the roads. Material shall be placed <br /> preferentially, so that any existing ditches or depressions are filled first. The roads shall be <br /> graded so that the slope of the road is to the outside, rather than inside, portion of the roads. <br /> Material removed during the grading operation shall be filled on the inside portion of the roads, <br /> to facilitate drainage to the outside of the roads. The remaining road remnant shall be ripped <br /> to a depth of eighteen (18) inches where soil depth allows. Approximately 1 ,825 feet of the <br /> fan road will receive this treatment. <br /> Ri in . In selected areas to be designated by the PROJECT MANAGER, portions of the road <br /> will be ripped to a depth of eighteen (18) inches where soil depth is sufficient. Due to the <br /> relatively flat running surface, no further earth work operations would be accomplished at <br /> these locations. It is estimated that 675 feet of the road will receive this treatment. <br /> Rolling Dips. Rolling dips will be constructed as described in Task 6 Surface Drainage. The <br /> locations of the dips shall be marked in the field by the PROJECT MANAGER. Upon <br /> completion of the rolling dips, the road remnants will be ripped to a depth of eighteen 0 8) <br /> inches as soil depth allows. Approximately 4 rolling dips will be constructed on the fan road. <br /> Task 4c - Mine 1 Yard <br /> An elevated bench area exists adjacent to the already partially-backfilled highwall near the <br /> northern portion of the wall. Material will be pushed up from this bench to cover the debris <br /> placed in this location during Task 2, Demolition. All debris placed in this location shall be <br /> covered by a minimum of four (4) feet of earthen material during this portion of the project. <br /> The excavated and filled slopes shall be uniform, and not exceed 2H:1 V upon completion of <br /> this task. It is estimated that 150 feet of highwall will be filled to a height of eight (8) feet <br /> above the elevation of the adjacent bench. <br /> A berm measuring an estimated 4 feet tall by 8 feet wide by 300 feet long exists at the south <br /> eastern portion of the Storage Yard Area. This berm will be pulled back onto the adjacent <br /> bench and graded flat to eliminate depressions in this area, and to promote sheet flow of <br /> surface water off the bench. <br /> A berm estimated to be 3 feet tall by 5 feet wide by 150 feet in length exists near the <br /> 12 <br />