My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-01_REVISION - M1978116 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978116
>
2012-10-01_REVISION - M1978116 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:06 PM
Creation date
10/19/2012 11:44:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978116
IBM Index Class Name
REVISION
Doc Date
10/1/2012
Doc Name
AM-02 EPP SUBMITTAL
From
COTTER
To
DRMS
Type & Sequence
AM2
Email Name
GRM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Southern Permitted Area <br />Surface disturbances in this area include: <br />a. Mine portals <br />b. Mine yard <br />c. Mining buildings /trailers <br />d. Haulage ramps <br />e. Ventilation shafts <br />f. Berms and ponds <br />g. Utilities <br />h. Waste rock pile <br />i. Ore stockpile <br />(For a list of acreages associated with each surface disturbance see Exhibit D - Mining <br />plan). <br />a. Mine Portals <br />The 2 portals here will be backfilled with waste materials to a depth where <br />competent rock is encountered (approximately 50 - 100 feet). No grading of the <br />portal will be required as it sits in the cliff face. <br />b. Mine Yard <br />The mine yard was not stripped of soil; it will only need to be ripped and seeded. <br />c. Mining Buildings /Trailers <br />The supplies trailer, office trailer, and fuel tank will be hauled offsite. The <br />compressor shed will be dismantled and hauled of site. Its foundation will be <br />broken up and placed in the portal prior to backfilling the portal. The soil will <br />then be ripped and seeded. <br />d. Haulage Ramps <br />The haulage ramp leading directly to the portal will be ripped and covered with <br />the soils and rocks currently stored along the side of the ramp. It will then be <br />pocked to enhance the moisture retention potential and seeded. Large rocks will <br />be placed at the top of the ramp to discourage access. <br />The haulage ramps accessing the ore and waste stockpiles as well as any roads <br />built for access to the ventilation shafts will similarly be ripped, soil will be <br />distributed where needed based on availability and the areas will be pocked and <br />seeded. <br />e. Ventilation Shafts <br />At the ventholes, all surface structures will be removed. The cement pad will be <br />broken up and placed in the shaft. Then the shaft will be plugged using either <br />polyurethane foam with a thickness of 10 feet, or concrete with a thickness of <br />E -2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.