My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-01_REVISION - M1978116 (17)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1978116
>
2012-10-01_REVISION - M1978116 (17)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 3:13:06 PM
Creation date
10/19/2012 11:44:18 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1978116
IBM Index Class Name
REVISION
Doc Date
10/1/2012
Doc Name
AM-02 EPP SUBMITTAL
From
COTTER
To
DRMS
Type & Sequence
AM2
Email Name
GRM
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
261
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />3 feet, placed far enough down the hole that a minimum of several feet of mine <br />waste and one foot of soil cover can be placed on top of this plug. This cover <br />material will be slightly mounded so that after natural compaction, there will not <br />be a depression remaining to collect any surface water. This area will then be <br />scarified and seeded. <br />f Berms and Ponds <br />All rainwater containment structures will be left in place in order to discourage <br />contact with the waste rock and ore pad. All retention ponds will be seeded, <br />ditches will not. <br />g• <br />Re- vegetation <br />Utilities <br />The portable toilets, water storage tank and air compressor will be hauled off site. <br />The transformer stations and power lines are the property and responsibility of the <br />San Miguel Power Association. <br />h. Waste Rock Pile <br />The waste pile will be graded to mimic the existing topography using a D -6 dozer <br />or equivalent. The slope will be no steeper than 3H:1 V anywhere on the surface. <br />Once the re- contouring is completed the area will be covered with topsoil to the <br />maximum depth possible (2 inches - 12 inches) using the soil salvaged from this <br />area during construction. The area will then be pocked using a Cat 315 excavator <br />or equivalent and then seeded using the recommended seed mixture. Experience <br />in the northern part of the property indicates that pocking will provide a more <br />sustainable re- vegetation effort even if large amounts of topsoil are not available. <br />i. Ore Stockpile <br />All ore will be removed prior to reclamation. As the waste rock pile is directly <br />adjacent to the ore stockpile area, some waste rock may be distributed over this <br />area to create a more gradual slope on the waste rock pile. The compacted soil on <br />this pad will then be scarified, covered with as much soil as possible from the soil <br />stockpile and seeded. <br />The following seed mixture is specified by DOE to be used on DOE leases in this area. <br />This seed mix was developed, in consultation with the U.S Bureau of Land Management <br />and is recommended for use on all affected acreage in this permit. Seed selection criteria <br />were based on climate and elevation ranges within these areas. Recognizing that surface <br />and soil conditions, nutrients, and available moisture can vary within these areas, <br />successful establishment of six or more of the twelve species is considered adequate. If <br />the total number of species seeded is less than that specified below, the seeding rates for <br />the individual species must be adjusted accordingly. All seed tags must be submitted to <br />DOE for verification prior to the seeding application. <br />E -3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.