Laserfiche WebLink
TASK DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> 3 Road Grading <br /> a Mine 2 Pond 800 Feet $0.74 $592 <br /> b Mine 1 Pond 500 Feet $0.74 $370 <br /> c 016 ponds 2,600 Feet $0.74 $1,924 <br /> 4 Rolled Dip <br /> Construction ` <br /> a Mine 2 Pond 3 Each $72.67 $218 <br /> b Mine 1 Pond 2 Each $72.67 $145 <br /> c 016 Road 11 Each $72.67 $799 <br /> 5 Remove Bear Ck. <br /> Culverts 1 Each $257.84 $258 <br /> 6 Remove Misc. <br /> Pipes;001, ------- Job N/A $500 <br /> Ponds s <br /> 7 Reclamation <br /> Repair(Haul <br /> Roads) 3 <br /> Rolled Dip <br /> Repair 12 Hours $80 $960 <br /> Road <br /> Revegetation 15 Acre $1,072 $16,080 <br /> 8 Revegetation 4 16 Acre $1097.78 $17,564 <br /> TOTAL $78,128 <br /> Pond Removal <br />