Laserfiche WebLink
Pond Removal Project (Reclaim all sediment ponds, and associated access roads when present. <br /> Repair damage caused by accessing some ponds over previouslyreclaimed roads) <br /> TASK DESCRIPTION QTY. UNIT UNIT PRICE AMOUNT <br /> 1 Mob/Demob 1 Job N/A $13,310 <br /> 2 Pond Removal ' <br /> a Prep.Plant Ponds 1 Job N/A $2,563 <br /> (4)(001) <br /> b Old Refuse Pile <br /> So.(006) $165 <br /> c Bus Garage <br /> Ponds(3)(008) $1,983 <br /> d Old Refuse Pile <br /> No.(009) $1,028 <br /> e Bath House Pond <br /> (009) $2,029 <br /> f Warehouse <br /> Ponds(2)(010) $389 <br /> g Mine 3 Ponds(2) <br /> (015) $280 <br /> h Tunnel Refuse <br /> Ponds(3)(016) $6,654 <br /> I Mine 5 Pond <br /> (017) $988 <br /> j Mine 1 Ponds(2) <br /> (018) $1,976 <br /> k Picnic Area Pond <br /> (020) $738 <br /> 1 Sutey Ponds(2) <br /> (021) $3,202 <br /> m Mine 2 Ponds(2) <br /> (022) $402 <br /> n Mine 3 Bin Pond <br /> (023) $191 <br /> o Slurry Pond <br /> (024) $830 <br /> p Rock Tunnel <br /> Pond(025) $422 <br /> q Fish Pond $1,568 <br />