Laserfiche WebLink
Pond Reclamation Notes <br /> ' Assume volume of pond (permit @ Vol. 7, Ch. IV) equal to volume of embankment to be <br /> pushed. Price includes cost of dewatering; CMP excavation; crushing and disposal; earth <br /> work. <br /> 2 Rolled dips built every 250 feet: Mine 1 pond road, north, 3 dips; Mine 1 ponds road, south 2 <br /> dips; 016 road 10 dips; 001 road, 6 dips. 001 pond road will not be graded. <br /> 3 Repair of damage incurred on previously reclaimed roads (Roads A, B, E, F, G) involves re- <br /> ripping dozer track, repair of damaged dips; install fertilize, seed, mulch. <br /> Assume 10' by 12 miles = 15 acres. Cost same as road revegetation @ $1072/Acre Repair <br /> dips @ $80/hour @ 1.5 days total time <br /> 4 Total of pond footprint is 13 Ac.; Access road acreages are: Mine 2 Pond: 0.3 Ac.; Mine <br /> 1 Pond: 0.2 Ac.; 016 Ponds: 0.9 Ac.; 001 Ponds: 0.3 Ac. Total pond access <br /> acreage is 2.8 Ac. Total Pond related acreage (not including haul road repair acreage) 16 <br /> Ac. <br /> 5 Cost includes remove, cut and haul from site. <br /> 6 Road grading unit price reduced by 20% due to decreased road width <br /> Pond Removal <br />