My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (190)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (190)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:59:57 AM
Creation date
10/19/2012 10:20:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Memo
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
were included in the bid price. $55,990/26,350 yd.' = $2.13 /yd.3 - 15% = $1.81/yd.3 <br /> c Average price calculated by rejecting unrealistically low proposal, averaging remaining bids. <br /> $55,990/26,350 yd.3 = $2.13 /yd.s <br /> D Average price of the Warehouse, and Mines 1 and 2 Projects was used, as these projects have <br /> most accurate volume estimate, and more closely approximate remaining job conditions. <br /> E Bid price @400 trees per acre @ $500 per acre; 200 trees per acre yield unit price of$250 per <br /> acre or $1.25 per tree. <br /> F Revegetation includes seed bed preparation when necessary, purchase and installation of <br /> fertilizer, application of seed, purchase and installation of mulch. <br /> Mine Bench Outslope Revegetation Estimated Unit Costs <br /> The cost to revegetate the Mine Bench Outslopes is estimated as follows. All assumptions are <br /> based solely on best judgement given experience and knowledge of the mine site conditions. <br /> Scope of Work: Slopes will be modified using hand labor. Laborers will create small <br /> benches (4" by 10" by 4") on a closely spaced pattern (approximately 2' spacing). Crews will be <br /> suspended by ropes, and will be provided with safety equipment. Because some sites have been <br /> previously reclaimed, access is provided by all terrain vehicles. Seed, fertilizer and mulch will be <br /> hand broadcast over the prepared slopes. <br /> All equipment, laborers, all terrain vehicles, tools, supplies and materials, excepting seed, will be <br /> provided by Contractor. <br /> Slope Scarification: Assume production at 0.1 acres per hour @ $22.33 per hour, plus 75% <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.