Laserfiche WebLink
Task Description Bids Analyzed Unit Prices Average Price per <br /> Unit <br /> Seed Purchase mine Seed Bids, 1996, $6.39 $5.92 $4.16 <br /> site mixture, 1997 4.01 <br /> delivered $5.12/# PLS <br /> Seed Purchase Seed Bids, 1997 $4.10 $3.70 <br /> outslope mixture, <br /> delivered $3.90/#PLS <br /> Seed Purchase Seed Bids, 1997 $1.07 $1.00 <br /> diversion mixture, <br /> delivered $1.04/#PLS <br /> Native Seed Mine 4 Steep Slope $6,500 <br /> Collection Revegetation (@ 150# collected) $43.33/# Collected <br /> Road Surface Roads $566, $1,400 <br /> Revegetation F 1,250 <br /> vehicle accessible, flat <br /> area, continuous $1,072.00/Ac. <br /> project <br /> Revegetation F Rock Dump, Rock $950, $1,050, <br /> lower elevation, Tunnel, Warehouse, 1,000, 600 <br /> slopes <3:1 Sutey 2,005, 650 <br /> 775 850 $1,097.78/Ac. <br /> 2,000 <br /> Revegetation F Warehouse $1,500, $800 <br /> lower elevation, 2,500 <br /> slopes>3:1 $1,600.00/Ac. <br /> ' Low bid cost to complete job increased to $20,000, as task completed at reported loss. <br /> A Price was for earthwork and grading. Subtract 10% for grading; total is $26,087 @ 8,000 yd.' <br /> B Average price calculated by rejecting unrealistically low proposal, averaging remaining bids. <br /> A 15% reduction was applied to compensate for spreading and grading of soil, which <br /> 6 <br />