My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (190)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (190)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:59:57 AM
Creation date
10/19/2012 10:20:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP) Memo
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
overhead. Overhead accounts for costs incurred for ropes, all terrain vehicles, safety equipment, <br /> slow job progress due to severity of slope angles, lost time due to access and incidentals related to <br /> job conditions and location, per diem, insurance, crew manager, overall job characteristics. <br /> $39.08 per hour = 10 hours per acre production= $390.80 ter acre <br /> Seed Application: Assume broadcast seeding <br /> $39.08 per hour = 1 acre per hour production= $39.08 per acre <br /> Fertilizer Application: Assume hand broadcast application <br /> Fertilizer Production: Assume half the production rate of seeding due to the amount <br /> necessary for application, and the heavier specific gravity of fertilizer. <br /> $39.08 per hour = 0.5 acre per hour production = $78.16 per acre <br /> Materials @ $50.00 per acre Total cost @ $128.16 per acre <br /> Mulch Application: Assume use of 2 tons per acre weed free green hay mulch to eliminate <br /> need for tackifier and crimping. <br /> Mulch Costs: $171.00 per ton delivered purchase price, $1,200 to transport to work sites and <br /> apply, plus 15% ($180) additional to cover unforseen problems of transportation of materials to <br /> top of slopes <br /> Total cost @ $1.722.00 per acre <br /> Total Cost, Mine Bench Outslope Revegetation: $2,280.04 per Acre <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.