Laserfiche WebLink
overhead. Overhead accounts for costs incurred for ropes, all terrain vehicles, safety equipment, <br /> slow job progress due to severity of slope angles, lost time due to access and incidentals related to <br /> job conditions and location, per diem, insurance, crew manager, overall job characteristics. <br /> $39.08 per hour = 10 hours per acre production= $390.80 ter acre <br /> Seed Application: Assume broadcast seeding <br /> $39.08 per hour = 1 acre per hour production= $39.08 per acre <br /> Fertilizer Application: Assume hand broadcast application <br /> Fertilizer Production: Assume half the production rate of seeding due to the amount <br /> necessary for application, and the heavier specific gravity of fertilizer. <br /> $39.08 per hour = 0.5 acre per hour production = $78.16 per acre <br /> Materials @ $50.00 per acre Total cost @ $128.16 per acre <br /> Mulch Application: Assume use of 2 tons per acre weed free green hay mulch to eliminate <br /> need for tackifier and crimping. <br /> Mulch Costs: $171.00 per ton delivered purchase price, $1,200 to transport to work sites and <br /> apply, plus 15% ($180) additional to cover unforseen problems of transportation of materials to <br /> top of slopes <br /> Total cost @ $1.722.00 per acre <br /> Total Cost, Mine Bench Outslope Revegetation: $2,280.04 per Acre <br /> 8 <br />