Laserfiche WebLink
02/18/94 11:05 Za505 7UUZUUM UJM ALbUW ru UUUj <br /> COMPARISON OF RECLAMATION COST ESTIMATES (continued) <br /> COAL BASIN MINE <br /> Task Description Operator DMG OSM <br /> (URI) <br /> 23. Rock Tunnel: 4 Feet Mat'1. 0 167,752. <br /> Placement 0 <br /> 24. Sutey Pile_ Downdrain 0. 0. 26,880. <br /> 25. Sutey Pile: Downdrain Riprap 0. 0. 24,667. <br /> 26. Sutey Pile: Terracing 0. 0_ 8,333. <br /> 27. sutey Pile: 100yr:24hr. <br /> U. 0. 272,708., <br /> Diversion <br /> 28. Sutey Pile: Toe drain for 37,500. <br /> Seeps 0 0. <br /> 29. Sutey Pile: 4 Feet Niaterial <br /> ° 0. 0. 412,928. <br /> Placement <br />✓� 30. Old Refuse Pile: Downdrain 0. 0. 26,880. <br /> oF�Y 31. Old Refuse Pile: Slope <br /> `G Stability 0. 0. 54,074. <br /> 32. Old Refuse Pile: Terracing 0. 0. 10,000. <br /> 33. Old Refuse Pile: 100yr-24br. <br /> 4. 11,426. <br /> Diversion 0. <br /> 34. Old Refuse Pile: Clear Water <br /> 0. 0. 65,000. <br /> Diversion <br /> 35. Old Refuse Pile: 4 Feet Mat'1. 219,368. <br /> Placement 0. 0. <br /> 36. Old Refuse Pile: Steep Slope 15,417_ <br /> Chute 0. 0. <br /> 37. Dutch Creek Relocation 0. 0. 931,500. <br /> 38. Dutch Creek Stabilization 0. 0. 286,704. <br /> 39. Rock Tunnel Facilities 10,764. <br /> Diversion 0. 0. <br /> 40. Carbondale: Earthmoving 0. 0. 9,442_ <br />