Laserfiche WebLink
UL/10/M'3 11.V0 VJVJ I VULUVa VJJLL CLLiJVq i'V W-:I VVL <br /> COMPARISON OF RECLAMATION COST ESTIMATES <br /> COAT. BASIN MINE <br /> Task Description Operator DMG OSM <br /> (MRn <br /> r <br /> 1. Revegetation $ 280,900. $ 459,837. $ 1,006,213. <br /> 2. Structural Demolition 765,405. 765,405. * 2,172,183. <br /> 3. Mine Bench backfilling 2-2,019. 42,524.58 2,927,162. <br /> 4. Prep. Plant Backfilling 142,129. 142,129. 0. <br /> 5. Finish grade Entire Site 40,983, 40,9830. Included in Item 3 <br /> 6. Sediment Pond Removal 28,134. 28,134. 146,231. <br /> 7. Replace Topsoil 232,567. 241,198. Included in Item 1 <br /> (245 ac) <br /> 8. Seal Portals & Fan Shafts 94.924. 94,924_ Included in Item 3 <br /> I 9. Topsoil on Sutey 56,955. 116,250. Included in Item 29 <br /> 10. Mobilization/Demobilization 5,568. 5,568. 139,325. <br /> 11_ Haulroad Backfilling 369,578. 281,595.** 4,616,057. <br /> 12. Rock Tunnel Backfilling 41,632. 41,632 <br /> 13. Rough Grade Entire Site 78,872. 78,872. Included in <br /> Items 3, 4, 10 <br /> 14. Backfill Light-use Roads 4,498. 4,498. 177,000. <br /> 15, Arch. Evaluation (Mine 5) 0. 0. 2,000. <br /> 16. Mine 5 Diversion 0. 0. 38,958. <br /> 17. Mine 5 Coal Removal & 0. 0. 94,076. <br /> Stream Stab. <br /> 18. Rock Tunnel: Downdrain 0. 0. 3,360. <br /> 19. Rock Tunnel: Removal 0. 0. 64,533. <br /> Combust. Material <br /> 20. Rock k Tunnel: Terrace 0. 0. 9,167. <br /> 21. Rock Tunnel: 100yr.-24hr <br /> Diversion 0. 0. 70,667. <br /> 22. Rock Tunnel: Reel. Clear <br /> Water Diversion 0. 1 0. 13,519. <br /> * Worksheet Estimate is $819,805 <br /> ** DMG accepted ME estimate for bond. <br />