Laserfiche WebLink
02/16/94 11:u0 psuo YOUZOua uam ALbUW ru l9yuu4 <br /> COMPARISON OF RECLAMATION COST ESTIMATES (continued) <br /> COAL BASIN MINE <br /> Task Description Operator DMG OSM <br /> (U RI) <br /> Totals (Rounded) 2,164,164. T 2,431,530_ 14.071,794. <br /> Indirect 561,434. <br /> Contingencies (4%) 562,872. <br /> Engineering Redesign (2%) 281,436. <br /> Contractor Overhead &Profit 281,436_ <br /> Reclamation Management tee 281,436.' <br /> (2%) <br /> Totals 2,164,164 2,993,964_ 15,478.974. <br /> * There is approximately $2.887 million worth of reclamation work not included in the Operator's or MRI's cost <br /> estimate. <br />