Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br /> I. EARTHWORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br /> Task #) Task Description Cost (S) <br /> ---I.��.----------------_._____._.---w....--------------I_______...._ <br /> 139 Regrade old Dutch Creek Flume void $2,728 <br /> 100 Rock Tunnel Pond D $1,142 <br /> 101 Rock Tunnel Pond E $2,781 <br /> 102 Mine #1 Ponds (2) $1,381 <br /> 103 Mine #2 Ponds A & B (2) $288 <br /> 104 Mine #3 South Ponds (2) $175 <br /> 105 Mine #3 North Pond $242 <br /> 106 Upper Rock Tunnel Pad Pond S302 <br /> 107 Mine #3 Bin Pad Pond $136 <br /> 108 Old Refuse Pile Pond $741 <br /> 109 Mine #4 Pond $186 <br /> 110 Mine #5 Pond $711 <br /> 111 Rock Tunnel Pond A $796 <br /> 112 Rock Tunnel Pond B $2,118 <br /> 113 Lower Preparation Plant Ponds A & B (2) $995 <br /> 114 ( Upper Preparation Plant Ponds C & D (2) $512 <br /> 115 Refuse Pile Top Pond North $512 <br /> 116 Refuse Pile Top Pond South $57 <br /> 117 Bus Garage Pond A $644 <br /> 118 Bus Garage Pond B $208 <br /> 119 Bus Garage Pond C $583 <br /> 120 Bath House Pond A $1,715 <br /> 121 Bath House Pond B $367 <br /> 122 Warehouse Ponds A & B (2) S278 <br /> 123 Glory Hole Pad Picnic Area Pond $616 <br /> 124 Wash Plant - Fish Pond $1,325 <br /> 125 Wash Plant - Slurry Pond $597 <br /> 126 Sutey Pond A $1,000 <br /> 127 Sutey Pond B $1,303 <br /> 0 <br /> 239 Stabilize channel from Rock Tunnel to Dutch Creek $1,996 <br /> 240 Remove culvert at Rock Tunnel $1,815 <br /> _____-_._________—________________________________________________M___ <br /> Subtotal (I): 528,249 <br /> sheet 5 of 10 <br />