Laserfiche WebLink
G. EARTHWORK - FINISH GRADING <br /> Task #1 Task Description Cost (S) <br /> I-----------------------------__-_-----_..------- ------------ <br /> 225 Dozer support and grading for road reclamation $47,360 <br /> 226 Contour furrows on Mine #5 reclaim $342 <br /> 135 Finish grade entire disturbed area $19,428 <br /> N/A Finish grade Carbondale Loadout (incl. task #135) <br /> 90 Finish grade Road A $173 <br /> 91 Finish grade Road 8 $124 <br /> 92 Finish grade Road C $502 <br /> 93 Finish grade Road D 5444 <br /> 94 Finish grade Road E $229 <br /> 95 Finish grade Road F $401 <br /> 96 Finish grade Road G $510 <br /> 144 Regrade light use roads $33,575 <br /> Subtotal (G): $103,088 <br /> H. EARTHWORK - STREAM CHANNEL CONSTRUCTION/RECONSTRUCTION <br /> Task #1 Task Description Cost (S) <br /> ------ --------------------------------------------------- ------------ <br /> Dutch Creek Diversion <br /> 136 Excavation $14,112 <br /> 227 Rip rap $192,424 <br /> Coal Creek Reestablishment (removed from estimate) <br /> 133 Excavation <br /> 228 Rip rap <br /> Rock Tunnel Waste Pile Diversion <br /> 137 Excavation $2,791 <br /> 229 Fabric lining $10,830 <br /> Old Refuse Pile Diversion and Downdrain <br /> 138 Excavation $6,357 <br /> 231 Rip rap $36,029 <br /> Subtotal (H): $262,543 <br /> sheet 4 of 10 <br /> y <br />