Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br /> E. EARTHWORK - RIPPING <br /> Task #1 Task Description Cost (S) <br /> I ---_------------------_..---------------------- ------- <br /> 70 Rip Shop area 5880 <br /> 71 Rip Prep Plant area S513 <br /> 72 Rip Rock Tunnel facility pad S586 <br /> 73 Rip coal stockpile bases, Prep Plant and Warehouse $1,099 <br /> 74 Rip Office/Warehouse area $513 <br /> 170 Rip remnants of Mine #1 bench $665 <br /> 171 Rip remnants of Mine #2 benches $224 <br /> 172 Rip remnants of Mine #3 benches S934 <br /> 173 Rip Mine #4 bench area $715 <br /> 174 ( Rip remnants of Mine #1/#2 coat storage bench $277 <br /> 216 Rip fan benches $3,979 <br /> 219 Rip Old Refuse Area access road $302 <br /> 220 Rip Rock Tunnel pile access road ( $165 <br /> 221 Regrade Old Refuse Area access road $1,808 <br /> 222 Regrade Rock Tunnel pile access road $986 <br /> ----------------------------_-__----_---------------------------_------- <br /> Subtotal (E): $13,646 <br /> F. EARTHWORK - ROAD RECLAMATION <br /> Task #1 Task Description Cost (S) <br /> ______I--------------------------------------------------- ------------ <br /> 30 Reduce Road A to postmine width $51,807 <br /> 31 Reduce Road B to postmine width 58,263 <br /> 32 Reduce Road C to postmine width $6,147 <br /> 33 Reduce Road D to postmine width $12,758 <br /> 34 Reduce Road E to postmine width $15,244 <br /> 35 Reduce Road F to postmine width $26,642 <br /> 36 Reduce Road G to postmine width $14,669 <br /> 40 Rip Road A reduction area $3,410 <br /> 41 Rip Road B reduction area $646 <br /> 42 Rip Road C reduction area $579 <br /> 43 Rip Road D reduction area $1,570 <br /> 44 ( Rip Road E reduction area $1,192 <br /> 45 Rip Road F reduction area $2,084 <br /> 46 Rip Road G reduction area $722 <br /> 60 Rip Road A surface $598 <br /> 61 Rip Road B surface S428 <br /> 62 Rip Road C surface $1,733 <br /> 63 Rip Road D surface $1,533 <br /> 64 Rip Road E surface $792 <br /> 65 Rip Road F surface $1,384 <br /> 66 Rip Road G surface $1,762 <br /> 134 Rip all light use road surfaces 54,196 <br /> -----____.....___________________------------------------------------------- <br /> Subtotal (F): $158,159 <br /> sheet 3 of 10 <br />