Laserfiche WebLink
tcl;-c <br /> RECLAMATION COST SUMMARY cont'd <br /> B. EARTHWORK - HIGHWALL REDUCTION <br /> Task #1 Task Description Cost (S) <br /> ______I------------------------------------------------- _-_________- <br /> 202 Backfitt (dozer) fan benches #1, #2, #4, and #5 S1,056 <br /> 203 Backfitt (dozer) Mine #1 bench S11,649 <br /> 204 Backfitt (dozer) Mine #1/#2 coal storage bench S11,611 <br /> 205 Backfitt (dozer) Mine #2 bench S4,360 <br /> 206 Backfitt (dozer) Mine #3 benches S21,386 <br /> 207 Backfitt (dozer) Mine #4 bench S8,594 <br /> 208 Backfill (dozer) Mine #5 bench S11,973 ✓ <br /> Subtotal (B): S70,629 <br /> C. EARTHWORK - WASTE PILE COVER PLACEMENT <br /> Task #1 Task Description Cost (S) <br /> ------I--------------------------------------------------- ------------ <br /> N/A Cover Sutey Waste Pile - included in task #145 <br /> N/A Cover Old Refuse Pile - included in task #148 <br /> N/A Cover Rock Tunnel pile - included in task #146 <br /> 37 Replace fill on Sutey Conveyor Access Road S8,366 <br /> _________.._____________________________________.._____—_______________.._ <br /> Subtotal (C): S8,366 <br /> D. EARTHWORK - FILL COMPACTION <br /> Task #1 Task Description Cost (S) <br /> I----------......,..---___-----_......._-------------------- ____________ <br /> 86 Compact coal refuse at prep. plant ( S9,213 <br /> 209 Compact fan benches #1, #2, #4, and #5 $316 <br /> 210 Compact Mine #1 bench S2,218 <br /> 211 Compact Mine #1/#2 coal storage bench S1,630 <br /> 212 Compact Mine #2 bench $830 <br /> 213 Compact Mine #3 benches $2,328 <br /> 214 Compact Mine #4 bench S1,760 <br /> 215 Compact Mine #5 bench $2,771 v <br /> I <br /> -___-____.._______________________________-_-_____-_-_______--______..__ <br /> Subtotal (D): $21,067 <br /> sheet 2 of 10 <br />