Laserfiche WebLink
Colorado Division of Minerals and Geology <br /> ' RECLAMATION COST SUMMARY FORM <br /> PERMIT NUMBER : C-81-017 PREP. BY : SLB FILENAME: C017-0 <br /> ,DATE: 30-pk 94 OPERATION: Coal Basin Mines <br /> PERMIT ACTION N/A <br /> ---------------------------------------- <br /> GRAND TOTAL BOND AMOUNT $5,077,035 <br /> 1. DIRECT COSTS <br /> A. EARTHWORK - BACKFILLING & ROUGH GRADING <br /> Task #1 Task Description Cost (S) <br /> --__--I---__-»_---_-_-._____.._»..».._____---___-__________..-- -_-_.M._____ <br /> 178 Backfill Dutch Creek #1 Mine benches $25,802 <br /> 179 Backfill L.S. Wood #2 Mine benches $9,657 <br /> 180 Backfill L.S. Wood #3 Mine benches $27,075 <br /> 181 Backfill Bear Creek #4 Mine benches $20,473 <br /> 182 Backfill Coal Basin #5 Mine benches $32,232 <br /> 20&21 Backfill Rock Tunnel bench $79,397 <br /> N/A Backfill Preparation Plant area (80,81, & 82) <br /> 201 Backfill Mine #1/#2 coal storage area $18,961 <br /> 129 Push "footprint" of Warehouse coat stockpile $4,348 <br /> 130 Push "footprint" f prep. plant coal stockpile (n/al <br /> 1 Backfill Mine #1 entry portals $1,489 <br /> 2 Backfill Mine #1 fan portals $1,116 <br /> 3 = Backfill Mine #2 entry portals $1,117 <br /> 4 Backfill Mine #2 fan portal $372 <br /> 5 Backfill Mine #4 entry portals $1,489 <br /> 6 Backfill Mine #4 fan portals $744 <br /> 7 Backfill Rock Tunnel portals $1,675 <br /> 8 Backfill Mine #5 fan portals $744 <br /> 157 Grade Old Refuse pile $5,082 <br /> 155 Grade Prep. plant area $12,202 <br /> 156 Grade Rock Tunnel waste pile $13,341 <br /> 0 <br /> 81 Haut refuse from Sutey to prep. plant $57,170 O <br /> 82 Haul warehouse coal stockpile base to prep. plant $19,784,) <br /> 217 Terrace Sutey waste pile, 60 hrs D8L ( $6,890 <br /> 218 Terrace Rock Tunnel waste pile, 40 hrs D8L $4,593 <br /> 175 Construct berms and ditches on all mine benches $30,906 <br /> 176 Grade foundation rubble at prep. plant $17,618 <br /> 177 Backfill all fan benches at Mines #1, #2, #4, and #1 $3,678 <br /> 9 Backfill Mine #3 entry portals $1,489 <br /> 10 Backfill Mine #3 fan portals $744 <br /> 11 Backfill Mine #5 entry portals $1,489 <br /> 246 Regrade Mine #1/#2 conveyor corridor $480 <br /> 247 Regrade Mine #3 conveyor corridor $480 <br /> 248 Regrade Mine #4 conveyor corridor $243 <br /> ------------------------------------------------------------------------ <br /> Subtotal (A): $402,882 <br /> sheet 1 of 10 <br /> _ I <br /> /I <br />