Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd <br /> J. EARTHWORK - TOPSOIL/SUBSOIL REPLACEMENT 8 SPECIAL HANDLING <br /> Task #1 Task Description Cost (S) <br /> —-----------..._..-----I________.�... <br /> 0 <br /> 0 <br /> 145 Redistribute topsoil on Sutey Waste pile $28,169 <br /> 146 Redistribute topsoil on Rock Tunnel waste pile ( $8,487 <br /> 147 Redistribute topsoil on Rock Tunnel pad 51,715 <br /> 148 Redistribute topsoil on Old Refuse pile $2,548 <br /> 149 Redistribute topsoil at main facilities area $31,957 <br /> 150 Redistribute topsoil on conveyor belt disturbance $6,241 <br /> 251 Redistribute topsoil at Mine #1 $32,090 <br /> Redistribute topsoil at Mine #2 (incl. in #251) <br /> 250 Redistribute topsoil at Mine #3 $6,020 <br /> 252 Redistribute topsoil at Mine #4 $20,939 <br /> 151 Redistribute topsoil on Mine #1 ponds, upper pile $47 <br /> 152 Redistribute topsoil on Mine #1 ponds, lower pile S31 <br /> 200 Redistribute topsoil at Mine #5 $11,269 <br /> ----------------------- --------------------------------------------- <br /> Subtotal (J): $149,513 <br /> sheet 6 of 10 <br />