Laserfiche WebLink
10,350'. Material to be moved is 6,313.5 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 34 - Reduce Road E to postmine width <br /> Current road width is 40', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove 1.41 yds3/lin. ft. Road length is <br /> 5,350'. Material to be moved is 7,543.5 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 35 - Reduce Road F to postmine width <br /> Current road width is 40', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove 1.41 yds3/lin. ft. Road length is <br /> 9,350'. Material to be moved is 13,183.5 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 36 - Reduce Road G to postmine width <br /> Current road width is 35', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove .61 yds3/lin. ft. Road length is <br /> 11,900'. Material to be moved is 7,259 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> Coal Basin Estimate Summary 4 April 4, 1995 <br />