My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (182)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (182)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:47:44 AM
Creation date
10/19/2012 10:19:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
Gen. Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
147
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 21 - Push Rock Tunnel bench material onto faceup <br /> 60' high cut, 96,800 yds3 of fill, 30% outslope. This half of fill comes from fill 150' east of <br /> tunnels, adjacent to North Fork of Dutch Creek. Permit @ <br /> Task 30 - Reduce Road A to postmine width <br /> Current road width is 55', which must be reduced to 22'. Assumin cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove 6.33 yds /lin. ft. Road length is <br /> 4,050'. Material to be moved is 25,636.5 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7, Findings Section XIX. <br /> Task 31 - Reduce Road B to postmine width <br /> Current road width is 40', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove 1.41 yds3/lin. ft. Road length is <br /> 2,900'. Material to be moved is 4,089 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 32 - Reduce Road C to postmine width <br /> Current road width is 30', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove .26 yds3/lin. ft. Road length is <br /> 11,700'. Material to be moved is 3,042 bcy. <br /> Since cuts and fills are 1:1, will need hydraulic excavator with long reach (Caterpillar 245B) to <br /> pull material up onto road surface. Material would then need to be pushed against cut slope with <br /> bulldozer. Task 225 includes dozer support for one half the excavator time. <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. <br /> References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 33 - Reduce Road D to postmine width <br /> Current road width is 35', which must be reduced to 22'. Assuming cut and fill slopes are <br /> currently 1:1 and will be reduced to 2:1. Need to remove .61 yds3/lin. ft. Road length is <br /> Coal Basin Estimate Summary 3 April 4, 1995 <br />
The URL can be used to link to this page
Your browser does not support the video tag.