Laserfiche WebLink
Task 6 - Backfill Mine #4 fan portals <br /> Number of openings (2) based on Map II-B-2 from permit application package. Dimensions <br /> from 1983 Division estimate. Permit @ V-D-3.a.; Rule 4.07.3 <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 7 - Backfill Rock Tunnel portals <br /> Number of openings identified on aerial photographs, dimensions based on 1983 Division cost <br /> estimate. Permit @ V-d-3.c.; Rule 4.07.3 <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 8 - Backfill Mine #5 fan portals <br /> Number of openings (2) based on Map II-B-2 from permit application package. Dimensions <br /> from 1983 Division cost estimate. Rule 4.07.3 <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 9 - Backfill Mine #3 entry portals <br /> Number of openings (4) based on Map II-B-2 from permit application package. Dimensions <br /> from 1983 Division cost estimate. Permit @ V-D-3.a. <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 10 - Backfill Mine #3 fan portals <br /> Number of openings (2) based on Map II-B-2 from permit application package. Dimensions <br /> from 1983 Division estimate. Rule 4.07.3 <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 11 - Backfill Mine #5 entry portals <br /> Number of openings (4) based on Map II-B-2 from permit application package. Dimensions <br /> from 1983 Division estimate. Permit @ V-D-3.a.; Rule 4.07.3 <br /> Production capability of dozer greatly derated to reflect difficulty of and care required in moving <br /> material in confined area and placing against block wall. <br /> Task 20 - Backfill Rock Tunnel faceup with tunnel pad material <br /> Information taken from 1983 estimate and subsequent permit modifications. 60' high cut, 96,800 <br /> yds3 of fill, 30% outslope. This half of fill comes from fill 200 yards southwest, adjacent to <br /> Dutch Creek, and is hauled by truck and loader. Rules 4.14.1; 4.14.2; Permit @ <br /> Coal Basin Estimate Summary 2 April 4, 1995 <br />