Laserfiche WebLink
References: Maps II-B-App. 7-Att.2; la and lb, 2-7; Findings Section XIX. <br /> Task 37 - Replace fill on Sutey conveyor access road <br /> Cross sections provided in a 1988 revision application (II-B-7) show fill to replaced at 54 ft' per <br /> lin. ft. and 70 ft' per lin. ft. Average of the two would be 62 ft3, or 2.3 yds3 per lin. ft. The <br /> length of the road is 1,800', which would require replacement of 4,140 yds3 of material. Since <br /> cut and fill slopes are steep, this would require use of a hydraulic excavator with a long reach <br /> (Caterpillar 245B). <br /> Production capability of excavator downgraded from optimum to reflect degree of difficulty in <br /> digging outslope, and long reach necessary. 8-27-84 revision. <br /> Task 40 - Rip Road A reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 17' of road surface. Triangular <br /> wedge to be removed, 17' base X 9' height over 4,050' of road. References: Maps II-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 41 - Rip Road B reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 9' of road surface. Triangular <br /> wedge to be removed, 9' base X 4' height over 2,900' of road. References: Maps II-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 42 - Rip Road C reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 4' of road surface. Triangular <br /> wedge to be removed, 4' base X 1.75' height over 11,700' of road. References: Maps II-B- <br /> App. 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 43 - Rip Road D reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 7' of road surface. Triangular <br /> wedge to be removed, 7' base X 3' height over 10,350' of road. References: Maps II-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 44 - Rip Road E reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 9' of road surface. Triangular <br /> wedge to be removed, 9' base X 4' height over 5,350' of road. References: Maps II-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 45 - Rip Road F reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 9' of road surface. Triangular <br /> wedge to be removed, 9' base X 4' height over 9,350' of road. References: Maps lI-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Task 46 - Rip Road G reduction area <br /> Volume is difference between 1:1 slope and 2:1 slope on outer 7' of road surface. Triangular <br /> wedge to be removed, 7' base X 3' height over 11,900' of road. References: Maps II-B-App. <br /> 7-Att.2; la and lb, 2-7; Rules 4.03.3; 4.06.4. <br /> Coal Basin Estimate Summary 5 April 4, 1995 <br />