My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-18_REVISION - C1980004
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1980004
>
2012-10-18_REVISION - C1980004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:37 PM
Creation date
10/19/2012 7:39:50 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980004
IBM Index Class Name
REVISION
Doc Date
10/18/2012
Doc Name
Adequacy Response #1
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
PR2
Email Name
MPB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Boulay <br />42. Paragraph (ii)(B) on page 2.05 -21 references Rule 4.05.6(11):a. This reference <br />appears to be in error. The Division believes that the intended reference may be <br />Rule 4.05.9(7). Please review, and revise as necessary. <br />MCM: Please see revised page 2.05 -18. <br />43. Rule 4.05.9(7)(d) requires that the minimum elevation of the top of the settled <br />embankment be 1.0 foot above the water surface in the pond with the emergency <br />spillway flowing at design depth. Please revise the third paragraph on page <br />2.05 -22 to include the specific language of (7)(d). <br />MCM: Please see revised pages 2.05 -19. <br />-19- October 16, 2012 <br />44. Surface water control systems are depicted on Figure 2.2 -3. The Division <br />has the following comments regarding this map. <br />a. Three cross sections of the pond feature are provided at horizontal scales <br />of 1" = 10' and 1" = 30'. The 1" =200' plan view of the proposed <br />sedimentation pond does not provide sufficient detail for review. Please <br />revise Figure 2.2 -3 to include a detailed plan view of the proposed <br />sedimentation pond at a scale of 1" = 30' or 1" = 10'. <br />MCM: Figure 2.2 -3 will not be resubmitted as there are no changes to the surface <br />facilities proposed. <br />b. On Section A -A', please label the outslope (h:v) of the pond embankment. <br />MCM: Figure 2.2 -3 will not be resubmitted as there are no changes to the surface <br />facilities proposed. <br />45. The requirements of 4.05.9(14), (15) and (17) regarding inspection of the <br />impoundment do not appear to have been addressed in the application. Please <br />provide commitments in the application regarding inspection and certified <br />inspection reports for construction of the sedimentation pond, and <br />quarterly inspections, in accordance with these sections. <br />MCM: Please see revised page 2.05 -21 & 22. <br />46. On revised page 2.05 -22, it is stated in Section 2.05.3(4)(a)(ii)(C) that the <br />sediment in the pond must be removed before the pond is 60% full of sediment. <br />Please revise this sentence to read that the sediment will be removed <br />
The URL can be used to link to this page
Your browser does not support the video tag.