My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (168)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (168)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 8:19:06 AM
Creation date
10/18/2012 9:49:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TASK 4 REVEGETAUON <br /> The CONTRACTOR will supply the fertilizer (manure or commercial), mulch, equipment <br /> for chiseling,fertilizer application,seeding,mulching and crimping. Revegetation efforts will <br /> occur on approximately seventeen (17) acres at the Sutey Refuse Pile, and on approximately <br /> eight (8) acres at the Number 5 Mine. <br /> Along with the revegetation specifications outlined in 20.0, Revegetation, attached, the <br /> following requirements will be adhered to: <br /> • The CONTRACTOR will notify the PROJECT MANAGER 2 (two)weeks prior <br /> to proceeding with the revegetation phase of the project. <br /> Sutey Refuse Pile Revegetation <br /> For slopes steeper that 3H:1V (2.0 acres): <br /> • Hydro mulching and hydro seeding with the seed mixture listed in the attachment <br /> (Sutey Pile Mixture)will be required. The fertilizer requirements will be supplied <br /> at the Pre-Bid Meeting. All steep slope areas greater than 3H:1V will receive this <br /> treatment. <br /> For slopes flatter than 3H:1V (15.0 acres): <br /> • All seed drilling and crimping operations will be operated on contour. <br /> • CONTRACTOR will supply all seed as per the attached seed mix (Sutey Pile <br /> Mixture). <br /> • PROJECT MANAGER will supply fertilizer requirements at the Pre-Bid <br /> Meeting. <br /> Number 5 Mine Revegetation <br /> The Number 5 Mine was revegetated in 1993, however the project did not achieve a <br /> successfully revegetated condition, therefore a second attempt at revegetation will occur. <br /> Due to the elevation of the Number 5 Mine, this revegetation project should be undertaken <br /> immediately upon CONTRACTOR mobilization. Seeding will be accomplished using a drill <br /> at the Number 5 Mine. <br /> • All seed drilling and crimping operations will be operated on contour. <br /> • CONTRACTOR will supply all seed as per the attached seed mix (5 Mine <br /> Mixture). <br /> • PROJECT MANAGER will supply fertilizer requirements at the Pre-bid Meeting. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.