Laserfiche WebLink
STM OF COLORADO <br /> MINED LAND RECLAMATION DIVISION of Coro <br /> Department of Natural Resources <br /> 1313 Sherman St., Room 215 F4e o <br /> o <br /> Denver,CO 80203 <br /> 303 866-3567 # 8 <br /> */876* <br /> FAX 303 832-8106 <br /> Roy Romer, <br /> Governor <br /> Fred R Banta, <br /> Division Director <br /> November 5, 1991 <br /> TO: JIM MCARDLE <br /> FROM: PAUL KRABACHER 'y <br /> RE: WESTERN STATES RECLAMATION (WS ) CLAIM/COAL BASIN <br /> On narrating billing procedures to Dave Chenoweth/WSR regarding dozer hours on <br /> October 2, 1991 an oversight was made with respect to the total hours <br /> utilized. Dozer hours used between project startup and August 22, 1991 were <br /> not included in the 125.8 hour total cited to him. After researching hours <br /> performed through job log studying, a totaling of machine hours for the entire <br /> project is attached. To summarize, a deficit of 15.5 hours exists not billed <br /> or paid to WSR. At the dozer rate of $91.26/hr. , this totals $1,414.53. This <br /> could be logically converted over to Item 3, Channel A construction because <br /> approximately this amount of time was utilized in constructing channels for <br /> directing and segregating runoff. The bid price for Channel A construction <br /> was $4.16 per linear foot. The cost oversight could be billed as 340.03 <br /> addtional l.f. of Channel A construction @ $4.16 equalling $1,414.52. <br />