Laserfiche WebLink
up to the lamphouse at the Rock Tunnels. They had also cleared the road down <br /> to the 016 pond series. Pond 016 was discharging clear water at approximately <br /> 30 gpm. The ponds were covered with snow but appeared stable. Pond 001 <br /> was also discharging clear water at about 10 gpm. The ponds were also <br /> completely snowbound but appeared stable.... Due to limited access to other <br /> sites this concluded the inspection. <br /> DMG Report of 12/17-18/92 <br /> ...During this time of the year very little activity is occurring due to weather <br /> conditions. The site is under cover of snow with only minimal areas being <br /> cleared of snow for access to conduct requireed sampling and limited <br /> maintenance. Pond 016 was inspected and was discharging dear effluent at <br /> approximately 50 gpm. The ponds appeared stable_and are under complete <br /> cover of snow. Pond 008 was also covered withznow and appeared stable with <br /> no discharge. Pond 001 was-in-the same condition with a slow drip discharge. <br /> Sutey pile was not accessible to the upper portion, but the lower area appeared <br /> stable. <br /> DMG Report of 1127/93. <br /> During this time of year very'ligle;Pactivity beyond environmental compliance - <br /> monitoring is occuring at the site: These has been an unusually heavy snowfall <br /> to date this year as evidenced-by the collapse of the roof on the Eimco shop <br /> building. Workers were removing rubble from this mishap during the <br /> inspection....Reclamation acM, es-will commence in late spring starting at the <br /> lower elevations until access is ayabble to the outiyirlg;areas. Exact details of <br /> this plan are being worked out-fhrough the remainder of°the winter. <br /> DMG Report of 2/18/93. <br /> ...Currently, very little activity beyond the required monitoring is occuring due to <br /> deep snow which has basically,paralyzed the site. There has been 14 feet of <br /> snowfall so far this season and ithad snowed 10 inches the previous night <br /> before this inspection. The operator is keeping only a limited portion of the road <br /> system plowed of snow including the main road from Redstone to the mine, the <br /> main road from the wash plant to the rock tunnel, the access road to Pond 016 <br /> and a few other areas around the wash plant and office.... A Rocky Mountain - <br /> Goat was observed near the wash plant area. Virtually no other activity, besides <br /> staying warm, are occurring at this site. <br /> DMG Report of 3/30/93. <br /> ...Following removal of salvageable equipment, the ventilation fans and <br /> dewatering pumps were shut down, and the underground portion of the mine <br /> Working Season- 1992-93 <br />