Laserfiche WebLink
WTI Im <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />0 <br />81,150 <br />SLF processing is temporarily paused <br />Total <br />0 <br />81,510 <br />SLF processing is temporarily paused <br />E) Drain Cover Fill (DCF) <br />Processing of Drain Cover Fill material began at the Drain Cover Processing area. A CAT D -10 <br />dozer and a skid -steer loader were used to process the material. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />tons <br />DCF Process <br />50,000 <br />208,613 <br />Total <br />50,000 <br />208,613 <br />F) Miscellaneous <br />No work performed during the week. <br />II) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />B) Geomembrane Installation <br />No work performed during the week. <br />C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Exposure <br />No work performed during the week. <br />E) Geomembrane Acceptance <br />No work performed during the week. <br />III) Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. <br />Straw bales were installed on the slope of the Mill Platform fill to be used as erosion controls. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and approved subgrade preparation for SLF placement within the Mill Site Earthworks <br />project. <br />MEW Weekly Report WE 09.22.2012 <br />