My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-10-05_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2012-10-05_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:09:13 PM
Creation date
10/9/2012 3:20:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/5/2012
Doc Name
CQA REPORT, 9/16/2012 - 09/22/2012
From
AMEC
To
DRMS
Type & Sequence
AM10
Email Name
TC1
Media Type
d
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AMEC observed and assisted with SLF placement within the Mill Site Earthworks proj(�(J. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the Drain Cover <br />Processing area. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relation -, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />One sample of SLF and two samples of DCF were obtained for laboratory testing during the week. <br />CIFNF:RAI. PROJECT ITEMS <br />.)II11unrrry of Concerns: <br />No conwi ns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Mill Site Earthworks project. <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on September 18, 2012. Items discussed included S�rfoty, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames: <br />None <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Summary of Incidents /nccicientslhlcalth & Safety Issues: <br />None <br />We trust the informati <br />September 22, 2012. <br />Joseph I lickoy, CQ,► <br />Approved By: <br />s and observations for the week ending <br />Date: September 22, 2012 <br />Date: P 2 <br />06-1, / - <br />MEW Weekly Report WE 09.22.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.