Laserfiche WebLink
AMEC observed and assisted with SLF placement within the Mill Site Earthworks proj(�(J. <br />AMEC observed, obtained samples, and assisted in the process of DCF material at the Drain Cover <br />Processing area. <br />Testing Summary <br />Laboratory testing continued (Particle Size Distribution, Atterberg Limits, Moisture - Density Relation -, <br />Specific Gravity, Permeability, and Point Load testing) for sampled materials. <br />One sample of SLF and two samples of DCF were obtained for laboratory testing during the week. <br />CIFNF:RAI. PROJECT ITEMS <br />.)II11unrrry of Concerns: <br />No conwi ns <br />Summary of Planning Items: <br />Continue slope contouring and subgrade preparation within the Mill Site Earthworks project. <br />Continue subgrade acceptance prior to SLF placement. <br />Continue SLF placement. <br />Summary of Non - conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC &V: <br />CC &V held a weekly construction meeting on September 18, 2012. Items discussed included S�rfoty, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames: <br />None <br />AMEC: <br />Daily toolbox safety meeting were attended by AMEC personnel. <br />Summary of Incidents /nccicientslhlcalth & Safety Issues: <br />None <br />We trust the informati <br />September 22, 2012. <br />Joseph I lickoy, CQ,► <br />Approved By: <br />s and observations for the week ending <br />Date: September 22, 2012 <br />Date: P 2 <br />06-1, / - <br />MEW Weekly Report WE 09.22.2012 <br />