Laserfiche WebLink
Project <br /> Date <br /> WORKSHEET NO. 2 <br /> STRUCTURE DEMOLITION AND DISPOSAL COST SUM MMARY <br /> Listing of Buildings to be Demolished: <br /> Type of Construc- Unit Cost <br /> tion Material Demolition <br /> Item <br /> 1 �*) Basis Cost <br /> 2) '2 ��o �C� r37� HOC <br /> 3) n Z 1 4—D <br /> a) <br /> 5) <br /> Total Cost <br /> Other Items to be Demolished: <br /> Debris Handling and Disposal Costs: <br /> � A <br /> c Aek' <br /> TOTAL DEMOLITION AND DISPOSAL COST = s 43013 <br /> -4 <br /> Data Sources: <br /> A-3 <br />