Laserfiche WebLink
Project <br /> Date <br /> WORKSHEET NO. 2 A <br /> STRUCTURE DEMOLITION AND DISPOSAL COST SUMMARY <br /> Listing of Buildings to be Demolished: <br /> Type of Construc- Volume Unit Cost Demolition <br /> Item tion Material (cubic feet) Basis Cost <br /> 3) <br /> 4) <br /> 5) -7 0 / ,Q 4-- <br /> Total Cost - $ 370 <br /> Other Items to be Demolished: <br /> Debris Handling and Disposal Costs: <br /> `�;-A ti '�c 'L. 03/ <br /> -330� <br /> -33 <br /> / z -�- <br /> TOTAL DEMOLITION AND DISPOSAL COST = f 143,9 ( s 3 S 5 44 <br /> Data Sources: <br /> A-3 <br />