Laserfiche WebLink
Project <br /> Date <br /> WORKSHEET NO. 5 A <br /> PRODUCTIVITY AND HOURS REQUIRED FOR DOZER USE <br /> Earthmov(ng Activity: - <br /> 607D 2- <br /> Characterization of Dozer Used (type, size, etc.): <br /> 12— <br /> 36 LLf <br /> Description of Dozer Use (origin, destination, grade, haul distance, material, etc.)•50-C " <br /> -*V— /a s� x 1, 4- sc <br /> Produc (vltS Calculations: <br /> Operating J <br /> Adjustment •�S x x '?3 x —5-4 x x x <br /> Factor operator material work hour grade weight production <br /> factor factor factor factor correction method/blade <br /> factor factor <br /> x q L x <br /> visibility elevation direct drive <br /> transmission <br /> Net Hourly Production S 7 S yd3/hr x yd 3/hr <br /> normal hourly operating <br /> production adjustment <br /> factor <br /> - 3 <br /> Hours Required J� 3 yd J (n—7 yd /hr = Z2 3, hrs <br /> volume to be net hourly <br /> moved production <br /> � � <br /> Data Sources: <br /> � <br /> t <br /> � f - <br />