Laserfiche WebLink
bonding estimates except for the rip-rapping and the other unengineered design <br /> needs. <br /> The TAD engineers did not have the detailed engineering available to determine <br /> volumes of backfilling material or the detailed building sizing for demolition and <br /> backfilling costing. TAD used the information furnished by the MLRD for these <br /> values. Additional field work is necessary to further evaluate the adequacy of <br /> these volumes. <br /> TAD did, as the attached forms indicate, estimate equipment and labor costs as <br /> recommended by the Dataquest "Cost Reference Guide" for equipment costing and <br /> used the MLRD labor costs. <br /> Some of the cost estimates furnished by MLRD were accepted by TAD when these <br /> estimates were backed up with adequate engineering analysis. (Copy of MRLD <br /> and MCCB costs estimates are attached). <br /> The September 20, 1991 TAD estimate for the MCCB reclamation Bond is <br /> $4,314,261 with the above mentioned use of furnished backfilling and volumes <br /> structure information. <br /> Prepared by: Date: <br /> Reviewed'by Date: <br /> Branch Chief: Date: 2 <br /> r <br />