Laserfiche WebLink
0670E _ Findings and Supportive Documentation RECEIVED <br /> STATE: <br /> n C T () 9 1991 <br /> Colorado <br /> Mined 'Land <br /> SUBJECT: Reclamation Division <br /> Recalculation of bond amount at the Mid-Continent asin Mines (MCCB). <br /> SHORT TITLE: <br /> Coal Basin Mine Bond <br /> REVIEW CRITERIA: <br /> Review reclamation along with Forest Service Study dated February 15, 1991 <br /> prepared by Tony Svatos, Forest Soil Scientist and Linda Ulmer, Forest Fisheries <br /> Biologist. <br /> MATERIALS REVIEWED: <br /> Forestry Service Study of MCCB; the Colorado Mine Land Reclamation Division <br /> (MLRD), April 1991, estimated reclamation bond calculation for MCCB and the <br /> Mid Continent Resources, Inc. April 1991, estimated bond calculation for the <br /> MCCB location. <br /> The United States Department of Agriculture Forest Service letter, Form 2720 <br /> dated September 16, 1986 with recommendations to Mid-Continent Resources as to <br /> post mining road specifications. Reports of the MCCB consultants <br /> recommendations for mine roads reclamation. The Geo-Hydro Consulting, Inc. <br /> November 30, 1983 report which detailed the road lengths, grades, construction and <br /> recommendations. <br /> The Technical Assistance Division (TAD) used the OSM "Handbook for <br /> Calculation of Reclamation bond Amounts" for this estimate. <br /> DISCUSSION: <br /> The Western Support Center, (WSC) TAD engineers reviewed the available <br /> material, met with the Forest Service personnel during the site visit of June 1991, <br /> and also met with the MLRD personnel responsible for the estimation of the <br /> reclamation bond. <br /> The MLRD 1991 reclamation bond estimate include backfilling costing per the <br /> Forest Service recommendation of September 16, 1986. The February 15, 1991 <br /> Forest Service Coal Basin Report recommendations have been included in the <br />