Laserfiche WebLink
Mr. George Wear - 5 - October 29, 1986 <br /> V. Loadout <br /> 1 ) The Division finds the reclamation plan for the loadout <br /> satisfactory. However, the cost of installing a concrete floor in <br /> the coal storage bin must be included in the calculation. As <br /> indicated in Mid-Continent's September 22, 1986 submittal , <br /> installation of this floor is necessary to achieve the post-mining <br /> land use. <br /> Mid-Continent Resources should submit all information required in this letter <br /> by November 30, 1986. If you have any questions, please contact <br /> Candace Thompson or me. <br /> Sincerely, <br /> Jeffrey H. Deckler <br /> Reclamation Specialist <br /> JHD/iml <br /> 4360F <br />