My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (314)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (314)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:37:31 PM
Creation date
9/28/2012 11:22:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-2- <br /> Total Cost Facilities Removal = - $ 73,800.00 <br /> Backfilling and Grading <br /> 1 . Bin Backfilling <br /> Material for backfilling the bins will be available from the base material of <br /> the Mine No. 2 coal stockpile and the alternative coal stockpile. It is <br /> assumed that two feet of material will have to be removed during reclamation <br /> to dispose of all coal . <br /> The Mine No. 2 coal stockpile has a base area of approximately 200 feet by 700 <br /> feet. The alternative coal stockpile area hr a base of approximately 450 x <br /> 175 feet. This makes a total available volume of backfill material of 16,200 <br /> cubic yards (cy) . <br /> A total volume of 36,644 cy will be required to backfill each bin. The <br /> additional material will be obtained from the coal refuse pile. <br /> The average haul distance from the Mine No. 2 coal stockpile is 4,200 feet one <br /> way; the average distance from the alternative coal stockpile is 1 ,250 feet <br /> one-way; and the distance from the Sutey refuse pile is 5,850 feet. <br /> 637D scrapers will be used to haul the backfill material . Hauling from the <br /> Mine No. 2 stockpile, total resistance is 10% (6% grade 4% rolling resistance). 1D,3�vc`{ <br /> The total cycle time for a 637D scraper haul.ing from_the -Mine-No. 2 stockpile <br /> would be: � _.. _00- 1300 LF, }1►'w- o�►�. w�� <br /> 1. 1 min. fixed time I.� MiN r1xeu T►ME <br /> 3.6 min. haul time H%VJ NAIJL TPHE <br /> 1 .6 min. return time M,ra RE:VVRP rAME <br /> 6.3 min. travel time <br /> AA tN1N gyp,"a- 'r me <br /> Therefore, at 26 cubic yards per cycle, a scraper could move 206 CY per 50 <br /> minute operating hour. �Q �• <br /> The total cycle time for a 637D hauling from the alternative coal stockpile <br /> area would be: �8K-U., _o S Aso <br /> 1. 1 min. fixed time I.� MAN v c1M`= <br /> 1 .4 min. haul time @ 10% total resistance N►NQ1- TIME <br /> .6 min. return time _5 rtiN Rom--1-vRn TIME <br /> 3. 1 min. total travel time MAj'O TRAv&-L- TWIG-- <br /> Therefore, at 26 cubic yards per cycle, a scraper can move 419 CY per 50 <br /> minute operating hour. <br /> The total cycle time for a 637D hauling from the Sutey refuse pile would be: <br />
The URL can be used to link to this page
Your browser does not support the video tag.