My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (314)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (314)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:37:31 PM
Creation date
9/28/2012 11:22:01 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-3- <br /> 1.1 min. fixed time <br /> 0.65 min haul time from refuse pile to wash plant @ 0% total resistance <br /> .0 ,100 ft. ) <br /> 3.3 0.9 min. haul time from wash plant to warehouse @ 8% total resistance <br /> (3,300 ft. ) 1550 L4: <br /> 1.70 min. return - bins to wash plant @ 0/ <br /> 1 .2 min. return - wash plant to refuse pile @ 12. 5% average resistance <br /> -T95rtu1 9. 1 min. total travel time <br /> Therefore, in a 50 minute operating hour, a scraper can move 143 CY per hour. <br /> At the Cline No. 2 and alternative coal- stockpiles, three 637D scrapers can be <br /> loaded by one D-9L dozer. To move the 10370 CY at the mine No. 2 coal <br /> stockpile area and to move the 5,830 CY at the alternative coal stockpile area <br /> would require three scrapers and one dozer 21 .4 hours. <br /> The cost for this portion of the backfilling would be: <br /> 1 - D9L dozer @ $144.29/hr. = $ 3,088.00 <br /> 3 - 6370 scrapers @ $626.38/hr. _ $ 13,405.00 <br /> 4 - Operators @ $72.00/hr. _ $ 1 ,541 .00 <br /> Total Cost $18,034.00 <br /> At the Sutey refuse pile, eight 637D scrapers can be loaded by tone_D9L dozer. <br /> A total of 20,444 cubic yards of fill are required to be hauled from the <br /> refuse pile for backfilling. It would take 8 scrapers and one dozer 17.9 <br /> hours to complete this operation at the following cost. <br /> k1 - D9L dozer @ $144.29/hr. $/,532.00 `` <br /> 8 - 637D scrapers @ $1 ,670.32/hr. _ $ 29,899.00+ <br /> 9 - Operators @ $162.00/hr = $ 2,900.00 <br /> Total Cost $ 35,381 .00'Co� v\� <br /> One D8L will be required at the bins to push material into the bins. In <br /> addition, a compactor and a crane to raise and lower the compactor. The <br /> backfill will have to be compacted in lifts. It is assumed that this will be <br /> completed concurrently with the hauling from the pits. Therefore, each piece <br /> of equipment will e used for 39.3 hours. The total cost would be : <br /> 1 - D8L dozer @ $110. 10/hr. = $ 4,327.00 <br /> 1 - Bantam T588 Crane @ 44.53/hr. _ $ 1,789.00 <br /> 1 - Raygo 1-36 compactor @ 4.82/hr. _ $ 189.00 <br /> 3 - Operators @ 54.00/hr = $ 2, 122.00 <br /> Total Cost $ 8,427.00 <br /> The total cost for backfilling the bins is $61 ,842.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.