Laserfiche WebLink
Mr. Jim Herron, MLRD Page 2 <br /> II. RECLAMATION COSTS (continued) <br /> Area 2. Remove conveyor structures <br /> A. Welding truck 55/hr x 16 hrs $ 880 <br /> B. Boom truck 60/hr x 16 hrs 960 <br /> C. 2 Dump trucks 90/hr x 16 hrs 1,440 <br /> Area 2. (cont'd.) Return to A.O.C. <br /> A. D-8 75. x 8 hrs 600 <br /> B. Topsoil 165. x 4 hrs 660 <br /> C. Seed and mulch 300/Ac 207 <br /> Subtotal $ 4,747 <br /> Area 3. Remove conveyor structures <br /> A. Welding truck 55. x 16 880 <br /> B. Boom truck 60. x 16 960 <br /> C. 2 Dump trucks 90. x 16 1,440 <br /> Area 3. (cont'd.) Return to A.O.C. <br /> A. D-8 75. x 6 hrs 450 <br /> B. Topsoil 165. x 2 330 <br /> C. Seed and mulch 300/Ac 69 <br /> Subtotal $ 4,129 <br /> Area 4. Remove conveyor structures <br /> A. Welding truck 55. x 24 1,320 <br /> B. Boom truck 60. x 24 1,440 <br /> C. 2 Dump trucks 90. x 24 2,160 <br /> Area 4. (cont'd.) Return to A.O.C. <br /> A. D-8 75. x 12 900 <br /> B. Topsoil 165. x 8 1,320 <br /> C. Seed and mulch 300/Ac 309 <br /> Subtotal $ 7,449 <br /> Area 5. Remove conveyor structures <br /> A. Welding truck 55. x 40 2,200 <br /> B. Boom truck 60. x 40 2,400 <br /> C. 2 Dump trucks 90. x 40 3,600 <br />