Laserfiche WebLink
Mr. Jim Herron, MLRD Page 3 <br /> Area 5. (cont'd.) Return to A.O.C. <br /> A. D-8 75. x 32 $ 2,400 <br /> B. Topsoil 165. x 32 5,280 <br /> C. Seed and mulch 300/Ac 756 <br /> Subtotal $ 16,636 <br /> Area 6. Remove stacker <br /> A. Welding truck 55. x 8 440 <br /> B. Boom truck 60. x 8 480 <br /> C. 2 Dump trucks 90 x 8 720 <br /> Area 6. (cont'd.) Return to A.O.C. <br /> A. D-8 75. x 16 1,200 <br /> B. Topsoil 165. x 16 2,640 <br /> C. Seed and mulch 300/Ac 690 <br /> Subtotal $ 6,170 <br /> Area 7. A. Seed and mulch 300/Ac 138 <br /> Area 8. Remove conveyor structures <br /> A. Welding truck 55 x 16 880 <br /> B. Boom truck 60 x 16 960 <br /> C. 2 Dump trucks 90 x 16 1,440 <br /> D. Seal portal 1,000 <br /> Area 8. (cont'd) Return to A.O.C. <br /> A. D-8 75 x 8 600 <br /> B. Topsoil 165 x 8 1,320 <br /> C. Seed and mulch 300/Ac 177 <br /> Subtotal $ 6,377 <br /> Area 9. Return to A.O.C. <br /> A. D-8 55 x 8 440 <br /> B. Topsoil 165 x 8 1,320 <br /> C. Seed and mulch 300/Ac 228 <br /> Subtotal $ 1,988 <br /> TOTAL BOND Grand Total $ 77,604 <br /> The topsoil from the tunnel face-up area will be stored with the conveyor topsoil <br /> by the No. 1 transfer point. <br /> Please contact me if you require additional information. <br /> Sincerely, <br /> DWBowman:ms <br /> nvir mental Coordina6r�'� <br />