Laserfiche WebLink
MID-CONTINENT RESOURCES, INC. <br /> PRODUCERS OF THE FAMOUS COAL BASIN COKING COAL <br /> BOX 158 <br /> CARBONDALE, COLORADO 81623 <br /> MID-CONTINENT RESOURCES,INC TELEPHONE <br /> 245 PLAINFIELD ROAD-SUITE 220 (303)963-2581 <br /> WILLOWBROOK,ILLINOIS 60521 TWX <br /> 910 929 6894 <br /> TLX <br /> 45-0724 <br /> RECEIVED <br /> Mr. Jim Herron <br /> Mined Land Reclamation Division APR 2 41984 <br /> 423 Centennial Bldg. <br /> 1313 Sherman St. MINED LAND RECLAMATION DIVISION <br /> Denver, Colorado 80203 Colo. Dept. of Natural Resources <br /> Re: T.R. for Conveyor System - Tunnel to Wash Plant <br /> File No. C-017-81 (Bond) <br /> Dear Jim: <br /> Enclosed are the detailed figures for the reclamation of the conveyor/bin system. <br /> I. DISTURBED AREAS <br /> Area 1. Main bins/pad and cuts and fills 2.93 Acres <br /> 2. Beltway from No. 1 transfer to bins 0.69 <br /> 3. Stacker belt to No. 2 stockpile 0.23 <br /> 4. Straight belt on Sheet 3 of 7 1.03 <br /> 5. Straight belt to tunnel 2.52 <br /> 6. Alternate coal storage area 2.30 <br /> 7. Topsoil storage area (above No. 1 transfer) 0.46 <br /> 8. Tunnel face-up 0.59 <br /> 9. Sediment ponds 0.40 + 0.22 + 0.14 0.76 <br /> Total 11.51 Acres <br /> II. RECLAMATION COSTS <br /> Area 1. Removal of bin roofs (all steel structures) <br /> A. Welding truck @ $55.00/hr x 40 hrs $ 2,200 <br /> B. Boom truck @ $60.00/hr x 40 hrs 2,400 <br /> C. 3 Dump trucks @ $45.00/hr = $135.00 x 40 hrs 5,400 <br /> Area 1. (cont'd.) Return to A.O.C. <br /> A. Dragline @ $85.00/hr x 120 hrs 11,900 <br /> B. D-8 @ $75.00/hr x 90 hrs 6,750 <br /> C. Topsoil: D-8 + 2 trucks $165/hr x 8 hrs 1,320 <br /> D. Seed and mulch @ $300/ac. 879 <br /> Subtotal $ 29,970 <br />