Laserfiche WebLink
Sutey Coal Refuse Disposal System - Reclamation Estimate <br /> 1 . Facilities Removal <br /> a. Conveyor System 1515 L.F. @ $24.80/L.F. $37,572.00 <br /> b. Culvert in Coal Creek 12' Dia. X 60 L.F. @ $70.00.L.F. 4,200.00 <br /> Concrete Headwalls 27 C:Y. @ $105.00/C.Y. 2,835.00 <br /> c. Road Culverts 210 L.F. @ $10.00/L.F. 2,100.00 <br /> 2. Backfilling and Grading <br /> a. Two sediment ponds ��� 8000 C.Y. @ $1 .50/C.Y. 12,000.00 <br /> b. Roads A& B 2300 LFx20'x4'7000 C.Y. @ $1 .50/C.Y. 10,500.00 <br /> c. Refuse Pile TD25 Dozer 40 Hrs. @ $120.00/Hr. 4,800.00 <br /> 3. Topsoil Replacement <br /> a. Refuse Pile 49,400 C.Y. @ $1 .85/C.Y. 91 ,390.00 <br /> b. Sediment ponds 3,500 C.Y. @ $1 .85/C.Y. 6,475.00 <br /> 4. Revegetation 10.8 Acres @ $1 ,500.00/Ac. 16,200.00 <br /> Total Estimate $188,072.00 <br /> .I <br />