My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (312)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (312)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:32:38 PM
Creation date
9/28/2012 10:54:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Maintenance procedures to insure stability of <br /> the rock spoil disposal area include the following : <br /> - conducting weekly inspection (4 . 09 .1 (10) ) of the fill to <br /> check if rills, gullies or tension cracks have developed; <br /> -supervising and monitoring fill construction; <br /> -constructing the earth fill slopes in accordance with 30 <br /> CFR 816 . 71 and 816 .72 ; <br /> -conducting weekly inspections of all drainage diversions, <br /> impoundments and culverts associated with the fill; <br /> -revegetating using standard engineering and reclamation <br /> procedures . <br /> A comprehensive water monitoring program of <br /> the permanent rock fill area will be accomplished by taking <br /> quantity and quality readings from the observation wells that <br /> have been drilled below and within the fill area . <br /> Water monitoring schedules for the tunnel <br /> portal area will be as follows: <br /> -all observation wells will be checked quarterly for static <br /> water levels and water quality samples will be taken; <br /> -all surface sample points will be sampled; <br /> -all water quality samples will be analyzed for the following <br /> parameters: TSS, TDS, pH, Iron (Fe) , Manganese (Mn) , and Conduc- <br /> tivity. <br /> See Volume 5 Exhibit III-E-1 (left side) . <br /> This map shows groundwater monitoring wells in the rock tunnel <br /> refuse. AT-2 A & B have been in place since the spring of 1981 <br /> (before that time not sufficient refuse was in place to warrant a <br /> 1_?� <br />
The URL can be used to link to this page
Your browser does not support the video tag.