My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_GENERAL DOCUMENTS - C1981017 (312)
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981017
>
_GENERAL DOCUMENTS - C1981017 (312)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2020 12:32:38 PM
Creation date
9/28/2012 10:54:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
GENERAL DOCUMENTS
Doc Name
Bid Documents (IMP)
Permit Index Doc Type
General Correspondence
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
118
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
monitoring well, less than 5 '+) . These two wells , one extending <br /> into the alluvium and the other to the bottom of the refuse have <br /> also been dry. <br /> 4 . Mine facilities <br /> a . Description of all buildings , structures <br /> and utility corridors . <br /> (1) General <br /> Coal Basin mine surface facilities consist of <br /> a preparation plant, explosives storage, methane gas pipeline, <br /> sewage treatment, water system, electrical transmission system, <br /> communication facilities and numerous support facilities (adminis- <br /> tration, supply, shop, etc . ) . All have been designed, constructed <br /> and are being maintained in accordance with federal, state and <br /> local regulations . Their locations are shown on Exhibits II-B-2- <br /> a thru d . Lists and descriptions of all surface buildings and <br /> structures located in the permit area are included in Appendix <br /> II-B-6. Narrative descriptions of the major surface facilities <br /> follow. <br /> (2) Preparation plant <br /> The Mid-Continent Coal Basin preparation <br /> plant utilizes three separate circuits to clean the coal from the <br /> Coal Basin mines . These are the heavy media, deister tables and <br /> flotation circuits . Before entering one of the circuits the run <br /> of mine coal is fed from bins via belt conveyor into the plant <br /> onto wet screens that separate the material into +14 inch and -34 <br /> inch sizes (Figure II-B-1) . <br />
The URL can be used to link to this page
Your browser does not support the video tag.